EED annual disclosures
A 500 kW installed IT threshold screens potential coverage; site configuration, national reporting arrangements and source measurements must be confirmed.
EED Article 12 and Delegated Regulation 2024/1364 cover qualifying data centres by installed IT power. National implementation, the rating scheme and proposed minimum performance standards require separate state tracking.
A 500 kW installed IT threshold screens potential coverage; site configuration, national reporting arrangements and source measurements must be confirmed.
PUE, WUE, ERF and REF require defined boundaries and method versions.
Simulations should remain clearly distinct from an enforceable final label or filing deadline.
German EnEfG, Irish connections and other country requirements layer on top of EU obligations.
The readiness screen is preliminary and does not certify compliance or submit any government form.